What the paper discloses
- Disclosed
- Kimi Team plus 168 named contributors (v1, Appendix A).
- Disclosed
- Trained on NVIDIA H800 GPUs, 8 per node (§2.4.1).
- Disclosed
- 1.04 trillion total parameters, 32 billion activated; pre-trained on 15.5 trillion tokens (abstract, §2).
Ledger lines
- Research labor · MODELED
- 168 people × 12 hours/week × 16 weeks × $96/hour = $3,096,576
168 named individuals; modeled partial-time effort. - Training compute · MODELED
- 6 × 32B active parameters × 15.5T tokens = 2.976e+24 FLOP ÷ (40% utilization × 989 TFLOP/s H800 peak) = 2,089,653 GPU-hours × $3.25/GPU-hour = $6,791,372
Disclosed inputs: 32 billion activated parameters and 15.5 trillion pre-training tokens on H800 GPUs. Uses the standard estimate of 6 FLOP per parameter per token. The 40% utilization is assumed; 30% or 50% would move GPU-hours by +33% or −20%. Pre-training only; post-training and evaluation are excluded. - Facility electricity · MODELED
- 2,089,653 GPU-hours × 0.5 kW × 1.5 server factor × 1.2 PUE = 1,880,688 kWh
Derived from the modeled pre-training GPU-hours. - Cooling water · MODELED
- 1,880,688 facility kWh × 0.375 L/kWh = 705,258 L
U.S. national average for 2023: about 66 billion liters of direct (on-site) data-center water use ÷ 176 billion kWh of data-center electricity = 0.375 L/kWh (LBNL 2024 United States Data Center Energy Usage Report). Applied to every paper so collection totals are comparable. It excludes water used to generate the electricity.
Pre-training compute is modeled from disclosed model size and token count. An earlier Klaritee record used an unexplained $5,000,000 allowance. Not Moonshot AI's actual spend.
Labor rate: Loaded research-labor rate: the national mean wage for Computer and Information Research Scientists ($67.74/hour, BLS May 2024) ÷ the wage share of total employer compensation (70.5%, BLS private industry, December 2024) = $96.09, rounded to $96. Applied uniformly so papers are comparable; it is not any institution's payroll and excludes institutional overhead. BLS Occupational Employment and Wage Statistics, 15-1221 (via O*NET) ↗ BLS Employer Costs for Employee Compensation, December 2024 ↗
Cooling-water intensity: U.S. national average for 2023: about 66 billion liters of direct (on-site) data-center water use ÷ 176 billion kWh of data-center electricity = 0.375 L/kWh (LBNL 2024 United States Data Center Energy Usage Report). Applied to every paper so collection totals are comparable. It excludes water used to generate the electricity. LBNL, 2024 United States Data Center Energy Usage Report (LBNL-2001637) ↗ U.S. Department of Energy release on the LBNL report ↗