What the paper discloses
- Disclosed
- Credits Nick Cammarata, with contributions from Curt Tigges (language-neuron research) and Tarun Gogineni (editing).
- Disclosed
- Reports preliminary audits of Qwen3-32B and an attribution graph from Kimi K3; no hardware, run time or budget is disclosed.
Ledger lines
- Research labor · MODELED
- 2 people × 20 hours/week × 20 weeks × $96/hour = $76,800
Two modeled technical contributors; not a claim about Goodfire staffing. - Compute · MODELED
- 2,000 H100 GPU-hours × $3.25/GPU-hour = $6,500
Modeled H100-class GPU-hours for neuron inspection, attribution and intervention experiments; none are disclosed. - Facility electricity · MODELED
- 2,000 GPU-hours × 0.5 kW × 1.5 server factor × 1.2 PUE = 1,800 kWh
Derived from the modeled GPU-hours with the canonical power model. - Cooling water · MODELED
- 1,800 facility kWh × 0.375 L/kWh = 675 L
U.S. national average for 2023: about 66 billion liters of direct (on-site) data-center water use ÷ 176 billion kWh of data-center electricity = 0.375 L/kWh (LBNL 2024 United States Data Center Energy Usage Report). Applied to every paper so collection totals are comparable. It excludes water used to generate the electricity.
The essay discloses no person-hours, hardware or budget. Every dollar figure here is a Klaritee model, not Goodfire expenditure.
Labor rate: Loaded research-labor rate: the national mean wage for Computer and Information Research Scientists ($67.74/hour, BLS May 2024) ÷ the wage share of total employer compensation (70.5%, BLS private industry, December 2024) = $96.09, rounded to $96. Applied uniformly so papers are comparable; it is not any institution's payroll and excludes institutional overhead. BLS Occupational Employment and Wage Statistics, 15-1221 (via O*NET) ↗ BLS Employer Costs for Employee Compensation, December 2024 ↗
Cooling-water intensity: U.S. national average for 2023: about 66 billion liters of direct (on-site) data-center water use ÷ 176 billion kWh of data-center electricity = 0.375 L/kWh (LBNL 2024 United States Data Center Energy Usage Report). Applied to every paper so collection totals are comparable. It excludes water used to generate the electricity. LBNL, 2024 United States Data Center Energy Usage Report (LBNL-2001637) ↗ U.S. Department of Energy release on the LBNL report ↗