What the paper discloses
- Disclosed
- 7 listed authors.
- Disclosed
- Efficiency measured on a single NVIDIA A100; "With 300 training steps (less than 9 GPU hours), C2C achieves a comparable result"; main fuser training is 1,929 steps; the number of trained configurations is not totaled.
- Disclosed
- Funding: National Natural Science Foundation of China grants, Tsinghua EE Xilinx AI Research Fund, BNRist (Acknowledgments, p. 11).
Ledger lines
- Research labor · MODELED
- 7 people × 15 hours/week × 16 weeks × $96/hour = $161,280
Seven authors; modeled research effort. - Compute · MODELED
- 3,077 H100 GPU-hours × $3.25/GPU-hour = $10,000
Fuser training (1,929 steps for the main setting; 300 steps take under 9 A100 GPU-hours) across several model pairs plus evaluation; the $10,000 allowance is expressed as H100-class GPU-hours at the modeled price. - Facility electricity · MODELED
- 3,077 GPU-hours × 0.5 kW × 1.5 server factor × 1.2 PUE = 2,769 kWh
Derived from the modeled GPU-hours with the canonical power model (GPU draw × server factor × PUE). - Cooling water · MODELED
- 2,769 facility kWh × 0.375 L/kWh = 1,038 L
U.S. national average for 2023: about 66 billion liters of direct (on-site) data-center water use ÷ 176 billion kWh of data-center electricity = 0.375 L/kWh (LBNL 2024 United States Data Center Energy Usage Report). Applied to every paper so collection totals are comparable. It excludes water used to generate the electricity.
Modeled scenario, not the team's expenditure.
Labor rate: Loaded research-labor rate: the national mean wage for Computer and Information Research Scientists ($67.74/hour, BLS May 2024) ÷ the wage share of total employer compensation (70.5%, BLS private industry, December 2024) = $96.09, rounded to $96. Applied uniformly so papers are comparable; it is not any institution's payroll and excludes institutional overhead. BLS Occupational Employment and Wage Statistics, 15-1221 (via O*NET) ↗ BLS Employer Costs for Employee Compensation, December 2024 ↗
Cooling-water intensity: U.S. national average for 2023: about 66 billion liters of direct (on-site) data-center water use ÷ 176 billion kWh of data-center electricity = 0.375 L/kWh (LBNL 2024 United States Data Center Energy Usage Report). Applied to every paper so collection totals are comparable. It excludes water used to generate the electricity. LBNL, 2024 United States Data Center Energy Usage Report (LBNL-2001637) ↗ U.S. Department of Energy release on the LBNL report ↗