What the paper discloses
- Disclosed
- 4 listed researchers.
- Disclosed
- Fine-tuning datasets of at most 5,000 examples; reproduction on Qwen 3.6 27B with LoRA rank 32 (Appendix); GPU-hours and search compute are not disclosed.
Ledger lines
- Research labor · MODELED
- 4 people × 15 hours/week × 16 weeks × $96/hour = $92,160
Four researchers; modeled part-time contribution. - Compute · MODELED
- 7,692 H100 GPU-hours × $3.25/GPU-hour = $24,999
Iterative dataset search, fine-tuning runs and grading; the $25,000 allowance is expressed as H100-class GPU-hours at the modeled price. - Facility electricity · MODELED
- 7,692 GPU-hours × 0.5 kW × 1.5 server factor × 1.2 PUE = 6,923 kWh
Derived from the modeled GPU-hours with the canonical power model (GPU draw × server factor × PUE). - Cooling water · MODELED
- 6,923 facility kWh × 0.375 L/kWh = 2,596 L
U.S. national average for 2023: about 66 billion liters of direct (on-site) data-center water use ÷ 176 billion kWh of data-center electricity = 0.375 L/kWh (LBNL 2024 United States Data Center Energy Usage Report). Applied to every paper so collection totals are comparable. It excludes water used to generate the electricity.
Not an Anthropic expenditure.
Labor rate: Loaded research-labor rate: the national mean wage for Computer and Information Research Scientists ($67.74/hour, BLS May 2024) ÷ the wage share of total employer compensation (70.5%, BLS private industry, December 2024) = $96.09, rounded to $96. Applied uniformly so papers are comparable; it is not any institution's payroll and excludes institutional overhead. BLS Occupational Employment and Wage Statistics, 15-1221 (via O*NET) ↗ BLS Employer Costs for Employee Compensation, December 2024 ↗
Cooling-water intensity: U.S. national average for 2023: about 66 billion liters of direct (on-site) data-center water use ÷ 176 billion kWh of data-center electricity = 0.375 L/kWh (LBNL 2024 United States Data Center Energy Usage Report). Applied to every paper so collection totals are comparable. It excludes water used to generate the electricity. LBNL, 2024 United States Data Center Energy Usage Report (LBNL-2001637) ↗ U.S. Department of Energy release on the LBNL report ↗